We compare quotes from leading insurers
BUSINESS INTERRUPTION INSURANCE BUILT FOR SEMICONDUCTOR MANUFACTURING DOWNTIME
Why Business Interruption Risk Is So High in Semiconductor Manufacturing
Semiconductor manufacturing is unusually exposed to business interruption because the cost of stopping production is rarely limited to the days the machinery is offline. Even when physical damage is repaired, fabs often face extended time to recommission utilities, stabilise cleanroom conditions, re-qualify processes, and complete customer validation steps. That means the true “interruption” can last weeks or months — and the financial impact can be severe.
Business interruption (BI) and loss of income insurance protects your gross profit (or gross revenue and fixed costs depending on policy basis) when an insured event causes a reduction in turnover and increased cost of working. For semiconductor manufacturers this cover is often the difference between recovering and suffering long-term commercial damage such as lost customer contracts, penalty clauses, or permanent market share loss.
Insure24 arranges specialist BI cover for semiconductor manufacturers, foundries, cleanroom facilities, wafer fabs, packaging and testing sites, and advanced electronics production lines — with policy structures designed to reflect the real-world time it takes to restore validated capacity.
PROTECT PROFIT, CASHFLOW & CUSTOMER COMMITMENTS
Cover That Accounts for Revalidation, Ramp-Up & Long Lead Times
Semiconductor BI claims often involve complex recovery actions: sourcing alternative process steps, expedited parts shipments, overtime shifts, temporary facilities, and additional testing to meet customer acceptance. A BI programme should respond to these realities, not just to a simplistic “repair time” estimate.
What Business Interruption & Loss of Income Insurance Can Cover
BI cover is typically triggered by an insured event that causes physical damage at your premises (depending on wording). Once triggered, the policy can cover the resulting loss of gross profit and additional costs incurred to keep the business running or to speed up recovery.
Typical BI Losses Covered
- Loss of gross profit due to reduced turnover
- Standing charges and unavoidable fixed costs during downtime
- Loss of income where revenue is the policy basis (e.g., service/testing sites)
- Increased cost of working to reduce the loss (overtime, outsourcing, expedited freight)
- Additional testing, calibration, and quality control needed during recovery (where insurable)
- Temporary premises costs or relocation expenses (where applicable)
- Claims preparation and professional fees (if included)
Important BI Policy Settings
- Indemnity period: 12, 18, 24+ months depending on restoration complexity
- Sum insured: realistic gross profit based on turnover and margin
- Extensions: utilities interruption, denial of access, suppliers/customers
- Waiting period: time deductible that may apply to certain triggers
- Trends clause: ensures claim reflects normal business trajectory
- Extra expense limits: aligned to plausible recovery actions
- Claims evidence: production records, WIP values, order book and contracts
Top Business Interruption Triggers in Semiconductor Manufacturing
Semiconductor downtime is frequently caused by a small number of high-impact trigger events. Understanding these triggers helps structure BI and engineering covers so there are no gaps.
Property Damage Events
- Fire, smoke or heat damage (including suppression discharge)
- Escape of water affecting cleanrooms, plant rooms or electrical areas
- Flood or storm damage (site-specific underwriting)
- Impact damage to building or critical infrastructure
- Theft or malicious damage causing facility disruption
- Structural damage requiring partial shutdown or decontamination
Engineering / Utilities-Driven Events
- Electrical failure: switchgear, transformers, UPS, PDUs
- HVAC failure causing temperature/humidity excursion
- Chiller breakdown or process cooling interruption
- Compressed dry air (CDA) / nitrogen supply interruption
- Water purity failure (where relevant) causing process shutdown
- BMS or controls failure leading to cascading stoppages
Supply Chain Disruption & Contingent Business Interruption
Semiconductor businesses often rely on single-source suppliers, specialist gases, materials, overseas packaging, and long lead-time equipment. Contingent BI (CBI) can extend cover to certain losses arising from insured events at key suppliers or customers, subject to policy triggers and underwriting.
Where CBI Can Help
- Key supplier shutdown affecting critical materials or components
- Overseas packaging/test partner disruption delaying shipments
- Customer site loss causing order cancellations or delay
- Logistics hub disruption impacting inbound/outbound flows
- Utility provider outage affecting your region (where applicable)
- Single-source tool OEM or service partner interruption
Key Underwriting Inputs
- Top suppliers/customers and concentration by revenue
- Service-level agreements and penalty clauses
- Inventory strategy and safety stock approach
- Alternative suppliers and dual-sourcing plans
- Geographic exposures and catastrophe accumulation
- Critical transport routes and logistics dependencies
How to Structure BI Cover for Real Recovery Timelines
BI cover fails when indemnity periods are too short, sums insured are understated, or recovery costs are capped below what’s realistically required. Insure24 helps you structure BI cover around the “revalidation and ramp-up” reality of semiconductor operations.
Common BI Mistakes
- Indemnity period based on repair time only (ignoring requalification)
- Gross profit sum insured not updated for growth or contract wins
- No allowance for extra expense and expedited recovery actions
- Engineering breakdown not integrated with property triggers
- Supplier/customer exposures not disclosed (no CBI options)
- Waiting periods or sub-limits that don’t match operational needs
Practical Recovery Cost Examples
- Overtime shifts and additional staffing during ramp-up
- Expedited parts shipments and emergency contractor call-outs
- Temporary chillers/dehumidifiers and specialist environmental controls
- Outsourcing processing steps to protect customer commitments
- Temporary test capacity to clear backlogs
- Specialist certification, validation and audit assistance
Business Interruption Scenarios for Semiconductor Manufacturers
Case Study: Escape of Water & Cleanroom Downtime
Situation: A leak in a cooling line caused water ingress near controlled zones, triggering shutdown and remediation.
Impact: Lost production, backlogged orders, and additional cost of restoring environmental stability and completing revalidation.
How BI Helps: BI cover can protect gross profit while extra expense supports overtime, specialist contractors, and accelerated recovery actions.
Case Study: Electrical Failure in Critical Distribution
Situation: A switchgear event caused power disruption, requiring repairs and inspections before restart.
Impact: Production stoppage, tool restart sequencing delays, and delayed customer delivery.
How BI Helps: Integrated engineering + BI structure supports both repair costs and the loss of income during the interruption period.
Case Study: Supplier Disruption & Missed Delivery Commitments
Situation: A key material supplier suffered a loss event, impacting delivery of critical inputs.
Impact: Production delays, increased costs to source alternatives, and risk of contractual penalties.
How BI Helps: Contingent BI can help protect income where an insured event affects a named supplier, subject to policy triggers and underwriting.
Case Study: HVAC Failure & Environmental Excursion
Situation: HVAC failure caused temperature/humidity drift outside specifications during production.
Impact: Shutdown, scrap risk, and time needed to stabilise conditions and restart safely.
How BI Helps: Where triggered by an insured event, BI can cover lost profit while extra expense supports temporary controls to restore operations.
Business Interruption Coverage Levels
Choose cover based on the time it would take to restore validated capacity — not just rebuild physical damage.
Starter BI
Ideal for: early-stage operations, smaller facilities, lower concentration risk
- 12-month indemnity period option
- Core gross profit protection
- Basic increased cost of working
- Simple extension selection
Standard BI
Ideal for: established sites with customer delivery obligations
- 18–24 month indemnity period options
- Higher increased cost of working limits
- Utilities interruption and denial of access options
- Professional fees / claims prep options
Premium BI
Ideal for: high-reliability supply chains, long revalidation timelines
- 24+ month indemnity periods where appropriate
- Enhanced extra expense and expedited recovery options
- Contingent BI for key suppliers/customers
- Tailored wording aligned to operational dependencies
Enterprise BI
Ideal for: multi-site operations and complex global dependencies
- Programme-level BI across sites
- Complex supply chain and accumulation considerations
- Advanced claims support and recovery planning
- Custom triggers and extensions subject to underwriting
Insure24 structured our BI cover around revalidation and ramp-up — not just repairs. That made the difference when we assessed realistic downtime scenarios.
Finance Director, Semiconductor ManufacturerWhy Choose Insure24 for Semiconductor BI Insurance
- BI structured around real semiconductor recovery timelines
- Integration with property and engineering breakdown to avoid gaps
- Support for supply chain and contingent BI design
- Clear guidance on sums insured and indemnity periods
- Fast, specialist quotation and claims support
How to Get Business Interruption & Loss of Income Insurance
- 1. Share turnover, gross profit (or revenue basis) and key contract commitments
- 2. Provide facility details and critical utilities dependencies
- 3. Identify key suppliers/customers for CBI where relevant
- 4. We recommend indemnity periods and realistic sums insured
- 5. Receive tailored quotations and activate cover quickly
FREQUENTLY ASKED QUESTIONS
+-
What does business interruption insurance cover for semiconductor manufacturers?
+-
How long should the indemnity period be for a fab or cleanroom facility?
+-
Does BI cover apply if a supplier is disrupted?
+-
What information do insurers need to quote for BI?
+-
Can BI cover include extra expense for expedited recovery?
+-
Is business interruption included in standard property insurance?

0330 127 2333





