We compare quotes from leading insurers
PCB WET-PROCESS RISKS NEED ENVIRONMENTAL-READY INSURANCE
Why PCB Manufacturers Face Higher Pollution Exposure
PCB manufacturing frequently involves wet processes and chemical handling — etching, plating, cleaning, resist stripping, surface treatments, rinse stages, and chemical storage. Even when you have excellent controls, pollution incidents can still happen through human error, equipment failure, tank/pipe leaks, bunding failure, incompatible chemical mixing, or damage during deliveries and transfers.
The cost of a pollution incident is rarely limited to “cleaning a spill”. It can include specialist containment and disposal, contractor costs, emergency response, investigation work, third-party property damage, and potential claims from neighbours, landlords or clients. In some scenarios, normal Public Liability policies can be restrictive for pollution exposures, particularly where issues are gradual or where clean-up costs and statutory obligations are involved.
Environmental & Pollution Liability Insurance (often called “environmental impairment liability”) is designed to address this gap by providing cover for certain clean-up costs and third-party liabilities arising from pollution incidents, subject to policy terms, conditions and insurer acceptance. Insure24 helps PCB manufacturers structure this cover around real processes, real chemical exposures and real contracts.
Call 0330 127 2333 or request a quote online.
What Is Environmental & Pollution Liability Insurance?
Environmental & Pollution Liability Insurance is a specialist liability policy that can cover certain costs and liabilities arising from pollution events. It is commonly designed to cover:
- Clean-up costs (including certain statutory clean-up obligations) following a covered pollution incident
- Third-party bodily injury and property damage arising from pollution, where the policy responds
- Legal defence costs in relation to covered claims and incidents
- Sudden and accidental pollution cover is common; broader cover may be available depending on risk and insurer appetite
Every policy is different. Some are focused on “sudden and accidental” incidents. Others can be structured to provide broader protection where the risk profile and controls support it. The key is to disclose your process properly and align cover to your real exposures: chemicals stored, quantities, storage arrangements, effluent handling, bunding, and emergency response capability.
For PCB manufacturers, environmental cover is often considered alongside property and liability policies because pollution events can trigger multi-policy issues: property damage, business interruption, third-party claims, and regulatory action. The best programme is one that behaves predictably under stress.
Why Public Liability Alone May Not Be Enough
Many PCB businesses assume “we have Public Liability, so pollution is covered”. In practice, public liability wording can be restrictive for pollution-related losses, particularly where the issue is not an immediate “sudden and accidental” event, or where the main cost is clean-up and statutory obligations rather than third-party injury.
Environmental insurance is designed to address these gaps and provide specialist incident response support (depending on insurer/policy). For wet-process industries, the policy can be as important to resilience as property and BI.
We will review your existing programme and explain (in plain English) where pollution exposure may sit, so you can make an informed decision.
PCB Scenarios Where Environmental Cover Can Be Valuable
- Chemical tank/pipework leak leading to contamination of drains or ground
- Spill during chemical delivery or transfer causing external contamination
- Firefighting water run-off causing pollution and clean-up obligations
- Bunding failure leading to a wider spread of contaminated liquids
- Contamination affecting neighbouring units, landlord areas or shared services
- Claims alleging odour, fumes, or contamination impacts from operations
Even where you act quickly, clean-up contractors, disposal and investigation costs can escalate fast.
Underwriting PCB Pollution Risk: What Insurers Look At
Environmental underwriting is detail-driven. Insurers don’t just ask “do you use chemicals?” — they want to understand how, where, and with what controls. A well-presented submission can improve premium and broaden insurer appetite. A vague submission often leads to higher pricing, restrictions, or refusal.
Insure24 helps PCB manufacturers translate their real-world process into an insurer-friendly risk description, focusing on what matters most.
Chemicals, Quantities & Storage
Insurers typically ask for a list of key chemicals and maximum quantities stored on site, plus how they’re stored and segregated. They may also ask how deliveries are managed and whether transfer points are supervised.
- Segregation of incompatible chemicals
- Bunded storage with capacity appropriate to largest container/tank
- Spill kits, neutralising agents and trained staff
- Clear labelling, SDS availability and COSHH controls
- Tank/pipe inspection and maintenance routines
If you already have strong controls, we help you evidence them clearly so underwriters can price fairly.
Effluent, Drainage & Containment
Underwriters will also focus on the route a spill would take. Even small spills become big costs if they reach drains, ground or water.
- Drain maps and isolation capability (where practical)
- Protection of external drains and transfer areas
- Effluent treatment and monitoring processes
- Secondary containment for wet process lines
- Emergency response plans and contractor contacts
These are often the difference between a “contained incident” and a “major clean-up event”.
Premises, Neighbours and Landlord Requirements
Your building type and neighbours matter. A PCB site in a standalone building with good separation is a different exposure to a unit in a multi-occupancy estate where drainage, shared access and proximity to other tenants can magnify the consequences of a pollution event.
Some landlords include environmental obligations in leases. Some customers ask for evidence of environmental cover as part of onboarding. We can help you align policy limits and wording with these external requirements without buying unnecessary cover.
How Pollution Incidents and Claims Typically Unfold
Pollution incidents move fast. The first few hours can determine severity and cost. A practical insurance programme supports both the immediate response and the longer-term claim process.
The usual pattern is: contain → assess → notify → clean up → document → manage third parties. Environmental policies often emphasise early notification and the use of approved contractors (requirements vary by insurer and policy). Your incident response plan matters.
Immediate Response: Reduce Spread and Cost
For PCB manufacturing sites, the most damaging outcomes often occur when liquids reach drains or escape external containment. Practical steps include:
- Stop the source safely and isolate affected areas
- Prevent entry to drains (covers, socks, barriers) where safe to do so
- Use trained staff and appropriate PPE (chemical exposure risk)
- Record the incident: time, volume estimates, actions taken
Good documentation supports both claims and regulatory interactions.
Claim Outcomes: What Costs Can Arise
Environmental incidents can create multiple cost categories:
- Specialist clean-up and decontamination contractors
- Waste disposal and hazardous material handling costs
- Testing, investigation, and monitoring costs
- Third-party property damage and business disruption claims
- Legal defence costs (where the policy responds)
The value of environmental insurance is often about controlling escalation and providing specialist response support, not just reimbursement.
“We realised our biggest exposure wasn’t just stock and machines — it was chemical risk and the cost of specialist clean-up if something escaped containment. Insure24 helped us structure environmental cover that matched our wet process reality.”
Director, UK PCB ManufacturerWhy Choose Insure24 for PCB Environmental Liability Insurance?
Environmental insurance is highly dependent on disclosure and risk presentation. Insure24 helps PCB manufacturers translate wet-process operations into clear underwriting submissions and obtain competitive terms from insurers who understand manufacturing exposures.
- Understanding of PCB wet-process chemical exposures and containment controls
- Support compiling insurer-ready chemical and storage summaries
- Guidance aligning cover with landlord/customer requirements
- Market access to insurers offering environmental solutions (subject to appetite)
- Clear explanations of policy triggers, exclusions and practical claims expectations
How to Get a Quote for PCB Environmental & Pollution Liability
The fastest route to terms is a clear summary of your chemicals, quantities and controls. If you can provide the items below, underwriting is usually smoother. If you can’t, we’ll guide you through a practical approach.
- 1. List of key chemicals and maximum quantities stored (approximate is fine to start)
- 2. Storage arrangements (bunding, segregation, internal/external, tanked vs packaged)
- 3. Wet process outline (etch, plating, cleaning, rinse stages) and where spills could occur
- 4. Drainage/effluent overview (treatment, monitoring, isolation capability)
- 5. Spill response plan, kits, training and emergency contractor contacts
- 6. Premises type and neighbours (multi-occupancy, proximity, landlord requirements)
- 7. Claims/incident history and any corrective actions taken
Once we have this, we approach the market for terms aligned to your actual exposure and budgets.
FREQUENTLY ASKED QUESTIONS
+-
Do PCB manufacturers really need environmental/pollution liability insurance?
+-
What’s the difference between “sudden and accidental” and “gradual” pollution?
+-
Will environmental insurance cover clean-up costs on our own site?
+-
Does pollution liability cover firefighting run-off after a fire?
+-
What information do insurers need to quote environmental cover for a PCB factory?
+-
Will environmental cover help with landlord or customer requirements?
+-
How quickly can Insure24 obtain terms?

0330 127 2333





