We compare quotes from leading insurers
INSURANCE FOR CLEAN MANUFACTURING ENVIRONMENTS
Why Contamination Risk Matters in PCB Manufacturing
PCB manufacturing is sensitive to small environmental changes. Dust, fibres, oils, moisture, residues, airborne particles, chemical carry-over and poor handling can all create defects that are hard to diagnose but expensive to fix. Many PCB processes rely on controlled conditions to ensure adhesion, plating quality, solderability, insulation resistance and long-term reliability.
Contamination risk isn’t just “a cleanliness issue” — it is a financial risk. It can generate scrap, rework, delayed deliveries and customer confidence loss. It can also lead to disputes when boards fail testing or exhibit intermittent faults after deployment. The right insurance programme can’t prevent contamination, but it can reduce how devastating it becomes when contamination is triggered by insured events such as fire smoke, water ingress, storm damage or a major HVAC / clean infrastructure failure.
Insure24 structures clean manufacturing risk around realistic loss scenarios: the cost to clean and restore controlled areas, the value of spoiled stock/WIP, and the business interruption impact while you re-qualify processes and rebuild customer confidence.
How Insurance Responds to Cleanroom & Contamination Losses
Contamination itself is not always automatically insured as a “cause of loss”. In most cases, insurers respond when contamination results from an insured peril (for example: fire/smoke, escape of water, storm damage, impact damage) and causes physical loss or damage to insured property or stock. The key is ensuring the policy wording, extensions and valuations reflect your controlled environment and the true cost of recovery.
The building blocks below are typically used to protect PCB manufacturers from contamination-driven losses. The correct mix depends on how controlled your environment is and where your most critical exposures sit (stock/WIP, quality, machine dependency, customer sectors).
Cover Sections That Usually Matter
- Property (buildings/contents) – including controlled-area infrastructure and specialist fit-out
- Stock / materials / WIP – high-value laminates, films, chemicals and part-processed boards
- Business interruption – loss of profit during downtime after insured events
- Increased cost of working – emergency cleaning, outsourcing, overtime and expedited logistics
- Equipment breakdown – where clean infrastructure relies on key equipment (subject to cover)
- Customer-owned goods – if you hold customer materials or prototypes
Key Wording Issues to Get Right
- Smoke/soot contamination – ensure the policy treats smoke damage as physical damage
- Escape of water / flood – deductibles and sub-limits can drive claim outcomes
- Stock definitions – clarify raw materials, WIP and finished goods
- Re-qualification time – BI indemnity period must reflect process restart reality
- Average clause – underinsurance can reduce payouts significantly
- Cleaning and restoration costs – check if specialist cleaning is included or limited
Common Contamination Sources in PCB Facilities
Contamination can occur in many ways — and the root cause is often a mix of people, process and environment. Underwriters and risk engineers want to know what your “weak points” are and how you detect, contain and correct issues quickly. The list below highlights common contamination sources and why they matter.
Environmental & Infrastructure Sources
- HVAC failure or poor filtration leading to dust/particle ingress
- Smoke/soot infiltration following fire incidents (even nearby fires)
- Water ingress, leaks or high humidity affecting materials and adhesion
- Poor segregation between chemical areas and clean process areas
- Construction/contractor works generating airborne contaminants
- Compressed air contamination (oil/water) impacting processes
Process & Handling Sources
- Residues from cleaning, etching, plating or rinsing stages
- Cross-contamination between batches and chemical carry-over
- Fingerprints/oils from handling without correct PPE controls
- Improper storage of laminates/films (moisture uptake, packaging damage)
- Inadequate ESD/clean discipline causing particulate transfer
- Mislabelled or mixed materials leading to hidden defects
Strong controls don’t just reduce claims — they also help insurance pricing. Insurers respond well to clear procedures: controlled access, gowning/PPE, filtration maintenance, humidity monitoring, cleaning validation, incoming inspection and traceability.
Stock, Materials & WIP Spoilage: The Hidden Cost of Contamination
In PCB manufacturing, contamination can render materials unusable long before you see a “dramatic” event. Films, laminates, coverlays and resists can be damaged by moisture, temperature swings or packaging compromise. Work in progress can be lost after a smoke event or water ingress because it cannot be reliably cleaned or re-qualified. This is why accurate stock/WIP valuation and definitions matter.
The insurance challenge is that some “spoilage” scenarios are gradual or operational, and insurers may not treat them as insured physical damage unless linked to an insured event. We help you structure the programme so that when a sudden insured event occurs, your stock and WIP are treated appropriately.
Items Often Overlooked
- Part-processed panels and assemblies (WIP) at different process stages
- High-value customer prototypes stored on-site
- Specialist chemicals and consumables with shelf-life constraints
- Tooling, fixtures and clean jigs that require specialist cleaning
- Packaging materials used to protect boards (where contamination makes them unusable)
What Underwriters Want to See
- Peak stock and WIP values (not just “average”)
- Storage conditions and environmental monitoring (humidity/temperature)
- Segregation of clean areas and chemical handling zones
- Cleaning and validation procedures after incidents
- Traceability and batch controls to limit the scope of spoilage
Business Interruption & Re-Qualification Time
After a contamination event, the recovery time isn’t just physical clean-up. Many PCB manufacturers must re-qualify processes, validate cleanliness, run trial batches, and sometimes pass customer audits before production can restart. This “re-qualification time” can be longer than expected — and it must be reflected in your business interruption (BI) indemnity period and continuity plan.
Insure24 helps you choose an indemnity period and BI structure that reflects your real recovery timeline: equipment availability, specialist cleaning lead times, customer sign-off requirements, and the practical ability to outsource work temporarily.
BI Considerations for Clean Facilities
- Indemnity period aligned to worst-case clean-up and re-qualification time
- Increased cost of working to fund emergency cleaning and outsourcing
- Claims preparation support and documentation costs
- Supplier dependency where specialist materials have long lead times
- Customer confidence recovery (and potential order delays) after incidents
Common BI Gaps
- Indemnity period too short (12 months chosen by default)
- No allowance for specialist clean-up costs under increased cost of working
- Stock/WIP values understated leading to liquidity pressure after an incident
- Failure to consider customer audits/qualification delays
- Cyber disruption excluded (even though traceability and scheduling are essential)
We had a smoke incident that didn’t destroy machines, but it contaminated areas and stock. Insure24 helped us ensure our policy treated smoke contamination properly and that our BI reflected the time needed to clean, validate and restart production.
Operations Manager, UK PCB ManufacturerFREQUENTLY ASKED QUESTIONS
+-
Is contamination itself an insured peril?
+-
Does property insurance cover smoke damage to a clean area?
+-
How should we value stock and work in progress for PCB insurance?
+-
Why is the BI indemnity period important after contamination events?
+-
Can we insure contractor works that increase contamination risk?
+-
How quickly can Insure24 arrange cover?
UNIQUE INSURANCE
TAILORED FOR YOU
Clean manufacturing environments can suffer major losses from “minor” incidents like smoke or water ingress. Speak to Insure24 to ensure your programme reflects controlled-area recovery costs, stock/WIP exposure and realistic BI recovery timelines.
PROTECT YOURSELF
- Cover for controlled-area infrastructure and specialist fit-out
- Stock, materials and WIP protection when insured events cause spoilage
- Business interruption structured around clean-up and re-qualification time
- Increased cost of working for emergency cleaning and outsourcing
- Support presenting contamination controls to insurers for better terms

0330 127 2333





